Appleton City Sidewalk - 1/29/21

Image
Section between Miller & Sunset has been removed and rock has been laid out.  Bulletin board check. Discussed some issues with the contractor. Continuing to work south. Removing the old sidewalk near Sunset Street. Getting base rock laid out. Compacting the base rock before leaving for the day.

Appleton City Sidewalk - 1/27/21

Image
Met with contractor and sub-contractor to walk through project and discuss problem areas. Demo will start tomorrow. This angled tree was discussed. Will have to remove to meet ADA clearance. Erosion control has been put in place. Here we have a stump that will likely have to be removed when the new sidewalk goes in. This was discussed with the engineer. Another tree that will have to be trimmed to allow ADA clearance.