Appleton City Sidewalk - 4/30/2021

Image
Digging out the old rock and getting the base compacted at the school. First layer of asphalt in and compacted. Top layer in and getting rolled. Working their way south. Getting new asphalt laid at the mayor’s drive. Finished product at the school.

Appleton City Sidewalk - 4/2/2021

Image
East side of Maple at the 4th street intersection. 5th Street intersection looking north. North end of the job looking south. Area that has had dirt work completed.  Just south of the school looking north. Main crew working on dirt work south of the school. Seeding and asphalt next week.

Appleton City Sidewalk - 4/1/2021

Image
Guys getting some bridge connections prepped for a pour today. A look at one of the problem areas we had. Guy wire went right where our new sidewalk was supposed to go so the engineers decided to go around the pole. Extended the storm pipe to daylight on the south end. View from the north looking south toward 4th street. Dirtwork being done by the main crew. A look at the new sidewalk down by the pool.