Appleton City Sidewalk - 4/1/2021
Guys getting some bridge connections prepped for a pour today.
A look at one of the problem areas we had. Guy wire went right where our new sidewalk was supposed to go so the engineers decided to go around the pole.
Extended the storm pipe to daylight on the south end.
View from the north looking south toward 4th street.
Dirtwork being done by the main crew.
A look at the new sidewalk down by the pool.